by Structural News | Apr 24, 2014 | Demolition, Implosion |
The demolition of a 300 meter stretch of the “Elevado da Perimetral” or the Elevated Perimetral Bridge was done early morning of Sunday, April 20th, 2014 in Rio de Janeiro, Brazil. The bridge was demolished in a previously calculated 3 seconds. The demolition happened...